PPCmetrics FRP 4 Calculator

Basis for the recommendation of the valuation interest rate

At a glance

Two central conditions

That’s what FRP 4 says:

The recommended technical interest rate (TI) must meet the two following conditions:

  1. Structural risk capacity: The technical interest rate must take into account the structure and characteristics of the pension fund as well as foreseeable changes.
  2. Ongoing financing: The technical interest rate must be below the expected return (appropriate margin).

 

The upper limit laid down in the directive is not mandatory and may be exceeded if justified. Any technical interest rate must be justified.

PPCmetrics FRP 4 Calculator

PPCmetrics support for FRP 4: With the PPCmetrics FRP 4 calculator, you can evaluate the technical interest rate for your pension fund in just a few seconds.

*mandatory field